
Highways · Bristol
Principal Inspection and NDT: M5 Avonmouth Viaduct
Principal inspection, NDT and weld inspection across all twenty spans of the 1.4 km M5 Avonmouth Viaduct, including 5.6 km of gantry rail, using rope access, MEWPs and gantries.
Read Case Study


