Bridges & Highways

Highways Paint Inspection To CC 486 (Formerly Series 1900)

Most coating failures on highway steelwork start with preparation or application, not with the product. Independent paint inspection catches those problems while they can still be put right. We provide qualified paint inspectors for new-build and maintenance painting on bridges and highway structures.

Series 1900 Has Been Replaced By CC 486

In September 2025, as part of the rewrite of the Manual of Contract Documents for Highway Works, Series 1900 Protection of Steelwork Against Corrosion was replaced by CC 486 Protection of steelwork against corrosion. The notes for guidance, NG 1900, were replaced by CP 486. Contract-specific choices, previously set out in Appendix 19/1, now sit in the works-specific requirements.

Schemes tendered before the change may still be running under Series 1900. Our inspectors work to whichever specification applies to the contract.

What CC 486 Requires Of The Paint Inspector

CC 486 requires the paint inspector to be from an independent organisation and to hold at least a level 2 coating inspection qualification certified by ICorr, NACE, AMPP or Frosio. The paint inspector verifies surface preparation at least once before each coat is applied, and visually inspects the finished system.

What We Check

The inspection follows the work from the start of surface preparation to final acceptance, with every check recorded against the specification.

StageChecksTypical CC 486 requirement
Surface preparationPreparation grade and cleanlinessSa 2½, Sa 3 or St 3 to BS EN ISO 8501-1, as specified
DustResidual dust on the prepared surfaceNo worse than Class 1 to BS EN ISO 8502-3
Soluble saltsSalt contamination of the prepared steelNot more than 20 mg/m²
LightingLight at the workfaceMore than 500 lux
Ambient conditionsSteel temperature, dew point and relative humidityNo painting within 3°C of dew point or above 80% RH; checked before each shift and every 10 minutes
Film thicknessDry film thickness of each coatMeasured to BS EN ISO 2808; not more than 50% above the specified minimum
AdhesionPull-off adhesion of the applied systemAt least 5.2 MPa to ASTM D4541, at least once per 20 m²

New Build And Maintenance Painting

On new steelwork, inspection usually starts at the fabricator's paint shop and continues through site coats and touch-up after erection. On maintenance schemes, the biggest risks are inadequate removal of old coatings and corrosion products, salt contamination on coastal and salted structures, and application in poor weather. We tailor the inspection frequency to where the risk lies.

Records You Can Rely On

Every inspection produces daily records of conditions, measurements and non-conformances, supported by photographs, together with the painting details the contract requires. That record is what protects the client and the contractor if the coating is ever questioned.

FAQ

Common Questions

What replaced Series 1900?

CC 486 Protection of steelwork against corrosion replaced Series 1900 in September 2025. CP 486 replaced the notes for guidance, NG 1900.

What qualification does a highways paint inspector need?

CC 486 requires at least a level 2 coating inspection qualification certified by ICorr, NACE, AMPP or Frosio, and requires the paint inspector to be from an independent organisation.

Why does the paint inspector have to be independent?

Independence means the inspector reports honestly against the specification without commercial pressure from the painting contractor, which protects the client and the long-term performance of the coating.

When can painting not take place?

Under CC 486, painting should not take place when the surface is less than 3°C above the dew point or when relative humidity rises above 80%. Conditions are checked before each shift and every 10 minutes thereafter.

Do you inspect paint shop work as well as site work?

Yes. We inspect at fabricators' paint shops and on site, including touch-up and site coats after erection.

Need An Independent Paint Inspector?

Tell us about the scheme, specification and programme, and we will confirm inspector availability and the inspection frequency you need.

Request Consultation